Pioneering Projects

 

Our pioneering projects normally take about half a day to assemble, when we have finished building what we set out to do we keep it set up for most of the remainder of the camp, the two main pioneering projects are below

(click the images to see a larger version of the picture)

The Swing Mark II

The Catapult

Pioneering1.JPG (168474 bytes) Pioneering2.JPG (160610 bytes) Pioneering3.JPG (175011 bytes)

The Swing

Pioneering4.JPG (234490 bytes) Pioneering5.JPG (206841 bytes) Pioneering6.JPG (250205 bytes)

Another good Pioneering project that we have encountered was at the international 'Campdowne 2000' where the Saturn sub-camp had an elaborate pioneering project that took the form of a Stargate which was quite impressive, they even had a motor attached to it the made it turn round! Click on the picture below for a larger picture

CampDowne2000_Stargate.JPG (20522 bytes)

Home